混凝土防渗墙在高地下水位渠段截渗效果评估——以南水北调中线总干渠方台段为例  

Evaluation of the seepage interception effect of concrete impermeable walls in high groundwater level canal sections:Taking the Fangtai section of the South-to-North Water Transfers Project as an example

在线阅读下载全文

作  者:王云飞 边传伟 郭亚楠 宋星辉 贺晓钢 WANG Yunfei;BIAN Chuanwei;GUO Yanan;SONG Xinghui;HE Xiaogang(Hebei Branch of South-to-North Water Diversion Group Middle Line Co.,Ltd.,Shijiazhuang 050035,China)

机构地区:[1]中国南水北调集团中线有限公司河北分公司,石家庄050035

出  处:《南水北调与水利科技(中英文)》2024年第S2期122-127,共6页South-to-North Water Transfers and Water Science & Technology

摘  要:南水北调中线总干渠方台段处于高地下水位区,面临水位上涨造成衬砌面板失稳风险。基于监测点位的渗压计和集水井水位数据,分析截渗工程措施的实施效果。结果表明:截渗工程措施后,单位降雨水位涨幅均值下降27.8%,截渗工程对强降雨后地下水位快速上涨有明显减缓作用;在降雨量、渠道内年均水位相近情况下,截渗工程前后同期地下水位降低约0.12m,高地下水压力有所改善;截渗墙外(上游)的渗压水位(UP-1)高于墙内(下游)的渗压水位(UP-2和UP-3),平均水位差达到0.7~0.9m,截渗工程实施显著地减轻了外水压力,有效阻拦外水压力和渗漏,对降低地下水位起到了积极作用。但目前地下水仍然持续保持较高水平,而依靠截渗工程,不能彻底消除衬砌板隆起破坏风险。对此有针对性地提出后续强排泵站参数设置建议,以期待为南水北调高地下水位段运行安全提供科学依据。The Fangtai section of the main canal of the South-to-North Water Transfers Project is located in a high groundwater level area,facing the risk of instability of the lining panel caused by rising water levels.Analyze the implementation effect of anti-seepage engineering measures based on monitoring points of osmometers and water level data of collection wells.The results indicate that:After implementing anti-seepage engineering measures,the average increase in unit rainfall water level decreased by 27.8%.The anti-seepage engineering has a significant slowing effect on the rapid rise of groundwater level after heavy rainfall;In the case of similar rainfall and annual average water level in the channel,the groundwater level decreased by about 0.12m before and after the interception project,and the groundwater pressure in the high ground improved;The seepage water level(UP-1)outside the impermeable wall(upstream)is higher than the seepage water level(UP-2 and UP-3)inside the wall(downstream),with an average water level difference of o.7~0.9 meters.The implementation of the impermeable project significantly reduces the external water pressure,effectively blocks external water pressure and leakage,and plays a positive role in lowering the groundwater level.But currently,groundwater levels continue to remain relatively high.Relying on anti-seepage engineering cannot completely eliminate the risk of lining plate uplift and damage.Provide targeted suggestions for setting parameters for subsequent forced discharge pump stations.To provide scientific basis for the safe operation of the high groundwater level section of the South-to-North Water Transfers Project.

关 键 词:截渗工程 高地下水位 南水北调工程 水位变化特征 

分 类 号:TV68[水利工程—水利水电工程]

 