检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:金伟 赵博 刘仁 于楚翘 JIN Wei;ZHAO Bo;LIU Ren;YU Chuqiao(Pumped Storage Technology and Economic Research Institute of State Grid Xinyuan company,Beijing 100761,China)
机构地区:[1]国网新源控股有限公司抽水蓄能技术经济研究院,北京市100761
出 处:《水电与抽水蓄能》2025年第1期115-120,共6页Hydropower and Pumped Storage
摘 要:背靠背启动是保证抽水蓄能电站机组可靠运行的重要手段。首先介绍了背靠背启动原理,然后重点分析了调速器、励磁、保护等系统对背靠背方式启动的影响,借助丰宁抽水蓄能电站背靠背参数优化过程对背靠背进行了研究,为后续抽水蓄能电站背靠背参数设定提供了新的思路。The back-to-back start-up is an important means to ensure the reliable operation of pumped storage power station units.This article first introduces the back-to-back starting principle,and then focuses on analyzing the impact of governor,excitation current,protection,and other systems on back-to-back starting.With the help of the back-to-back parameter optimization process of Fengning Power Station,the back-to-back starting is studied,providing a new idea for the back-to-back parameter setting of the subsequent power station.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.116.27.229