九龙水库坝基帷幕灌浆试验探讨  

The test of curtain grouting for dam foundation of Jiulong Reservoir

作  者:刘建利 LIU Jianli(Hebei Institute of Investigation&Design of Water Conservancy&Hydropwer Group Limited,Tianjin 300220,China)

机构地区:[1]河北省水利水电勘测设计研究院集团有限公司,天津300220

出  处:《水科学与工程技术》2025年第1期83-85,共3页Water Sciences and Engineering Technology

摘  要:九龙水库位于滇东高原,岩溶发育,坝基渗漏问题严重,采取坝基帷幕灌浆处理措施,对水库建成蓄水具有重要意义。帷幕灌浆试验在坝基灌浆廊道内进行,受场地条件限制,按设计帷幕灌浆孔距、排距进行,为取得灌浆压力、水泥位耗量、待凝时间及灌浆底界等参数,进行坝基帷幕灌浆试验是必要的。通过坝基帷幕灌浆试验,取得了坝基帷幕灌浆压力、水泥位耗量、待凝时间及灌浆底界等设计参数,对设计及后期帷幕灌浆施工具有重要的指导意义。Jiulong Reservoir is located in the east of Yunnan Plateau,Karst is developed,dam foundation seepage problem is serious,taking measures of dam foundation curtain grouting is of great significance to the completion of the reservoir impoundment.The curtain grouting test is carried out in the Grouting Gallery of the dam foundation,which is limited by the site conditions and is carried out according to the designed curtain grouting hole spacing and row spacing,it is necessary to carry out curtain grouting test for Dam Foundation.Based on the test of Dam Foundation Curtain Grouting,the design parameters of dam foundation curtain grouting pressure,cement level consumption,setting time and grouting bottom boundary are obtained.

关 键 词:岩溶 帷幕灌浆 试验 孔距 排距 灌浆压力 

分 类 号:TV543[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象