作 者:刘瀚和 LIU Hanhe(China Nerin Engineering Co.,Ltd.,Nanchang,Jiangxi 330038,China)
机构地区:[1]中国瑞林工程技术股份有限公司,江西南昌330038
出 处:《有色冶金设计与研究》2025年第1期38-41,共4页Nonferrous Metals Engineering & Research
摘 要:按我国现行规范要求,尾矿库调洪演算应采用水量平衡法计算,且一次洪水排出时间应小于72 h。但当尾矿库调洪库容可装下一次洪水总量时,则多出现计算结果不能满足规范要求的情况。通过案例分析,提出可通过拟定更高水头的条件下得出满足规范要求的洪水位,并依此确定符合尾矿库防洪安全要求的防洪高度。According to the current codes in China,the method of water balance is used to calculate the flood control of tailings storage,and the flood discharge time should be less than 72 hours.However,when the flood control capacity of the tailings storage can accommodate the total amount of the flood,it often occurs that the calculation results cannot satisfy the requirement of the codes.Through case analysis,it is proposed that the flood level that meets the codes requirements can be derived by formulating higher water head,and accordingly,the required flood control height can be finally determined to ensure the safety of tailings storage flood control.
关 键 词:尾矿库 调洪演算 水量平衡法 防洪高度 调洪库容
分 类 号:TD926.4[矿业工程—选矿] TV122[水利工程—水文学及水资源]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.216.147.211