检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:何德 He De(Sinohydro Engineering Bureau 8 Co.,Ltd.,Changsha,410000)
机构地区:[1]中国水利水电第八工程局有限公司,长沙410000
出 处:《建设科技》2024年第S1期36-38,共3页Construction Science and Technology
摘 要:人工砂石系统在水电工程中应用比较广泛,然而如何设计好人工砂石系统的工艺流程,落实好相应的设备选型,仍是目前水电工程亟待解决的问题。本文结合以往水电工程项目的实践经验,分析了水电工程人工砂石系统的设备选型,对水电工程人工砂石系统的工艺流程进行了探讨,希望可以给人工砂石系统应用带来参考。In the practice of hydropower engineering projects,artificial sand and gravel system has been widely used.However,how to design the process flow of artificial sand and gravel system and implement the corresponding equipment selection is still an urgent problem to be solved in the current hydropower project.Based on the practical experience of previous hydropower projects,this paper analyzes the equipment selection of artificial sand and gravel system of hydropower projects,and discusses the technological process flow of artificial sand and gravel system of hydropower projects,hoping to provide some reference for the application of artificial sand and gravel system.
分 类 号:TV53[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.31