检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:蓝胜 LAN Sheng(China Southern Power Grid Company Limited ,Guangzhou 510663 China)
机构地区:[1]中国南方电网有限责任公司,广东广州510663
出 处:《红水河》2025年第1期81-84,94,共5页
摘 要:库址比选是抽水蓄能电站前期设计阶段的重要内容。笔者以广西钦州抽水蓄能电站为例,从成库条件、枢纽布置、地质条件、施工条件、投资等方面,对库址方案进行定性及定量分析比较论证。根据比较结果,确定经济合理且技术可行的库址方案作为推荐方案。该研究方法可为类似工程的库址比选提供参考。Reservoir site selection is an important part of the design for pumped storage power station in the early stage.Taking Qinzhou Pumped Storage Power Station in Guangxi as an example the author makes the qualitative and quantitative analysis and comparison of the reservoir site scheme from the aspects of reservoir formation conditions hub layout geological conditions construction conditions and investment.According to the comparison results the economically reasonable and technically feasible reservoir site scheme is determined as the recommended scheme.The research method can provide reference for the comparison and selection of similar project sites.
分 类 号:TV743[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.38