检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张伟 ZHANG Wei(Shanxi Huobaoganhe Coal Mine Co.,Ltd.,Linfen,Shanxi 041600,China)
机构地区:[1]山西霍宝干河煤矿有限公司,山西临汾041600
出 处:《自动化应用》2025年第3期114-116,121,共4页Automation Application
摘 要:供电系统是霍宝干河煤矿综采工作面的重要构成部分,在保障煤矿正常开采和安全方面发挥着重要作用。在介绍该综采工作面主要用电设备的基础上,对移动变电站的数量以及型号进行设计分析。共设置4台移动变电站,其中1#移动变电站、2#移动变电站基于分列运行方式工作。根据供电系统的综合方案,对高压电缆和低压电缆进行计算和选型,选用的电缆都能够满足电流和电压方面的基本要求。The power supply system is an important part of the fully mechanized mining face in Huobaoganhe Coal Mine,which plays an important role in ensuring the normal mining and safety of the coal mine.Based on the introduction of the main electrical equipment of the fully mechanized mining face,the number and type of mobile substations are designed and analyzed.A total of 4 mobile substations are set up,among which 1#mobile substations and 2#mobile substations work based on the disaggregated operation mode.According to the comprehensive scheme of the power supply system,the high-voltage cable and low-voltage cable are calculated and selected,and the selected cables can meet the basic requirements of current and voltage.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7