某抽水蓄能电站上水库面板堆石坝蓄水期成果分析  

Analysis of the Results of the Storage Period of a Concrete Faced Rockfill Dam in a Pumped Storage Power Station Upper Reservoir

在线阅读下载全文

作  者:钟燕辉 ZHONG YanHui(Shankouyan Hydro-junction Management Center,Pingxiang Jiangxi,337000,China)

机构地区:[1]萍乡市山口岩水利枢纽管理中心,江西萍乡337000

出  处:《萍乡学院学报》2024年第6期15-18,共4页Journal of Pingxiang University

摘  要:为了探讨某抽水蓄能电站上水库面板堆石坝在蓄水期间的性能,文章系统地分析了工程的关键结构特征,涵盖堆石坝的设计细节、所用材料和施工技术;讨论了自动监测系统如何有效地监控坝体的变形和应力变化,以便及时发现并解决潜在的工程问题。通过评估工程建设和管理过程中的亮点与挑战,总结了相关成果和经验,这对于类似工程的设计和运营具有重要的参考价值。In order to explore the performance of the face slab rockfill dam in the upper reservoir of a pumped storage power station during the water storage period,the article systematically analyzed the key structural features of the project,covering the design details,materials used and construction techniques of the rockfill dam.It also discussed how the automatic monitoring system effectively monitors the deformation and stress changes of the dam body so as to detect and solve potential engineering problems in a timely manner.By evaluating the highlights and challenges in the process of project construction and management,the relevant achievements and experiences were summarized,which are of important reference value for the design and operation of similar projects.

关 键 词:面板堆石坝 抽水蓄能电站 蓄水期 成果分析 

分 类 号:TV698.1[水利工程—水利水电工程]

 