瓦石峡水库工程导流洞闸井优化试验研究  

Experimental Study on the Optimization of the Diversion Tunnel Gate Shaft in the Washi Gorge Reservoir Project

在线阅读下载全文

作  者:赵帅杰 赵锦程[1] Zhao Shuaijie;Zhao Jincheng(Xinjiang Water Resources and Hydropower Survey Design and Research institute Limited Liability Company,Urumqi 830000,China)

机构地区:[1]新疆水利水电勘测设计研究院有限责任公司,乌鲁木齐新疆830000

出  处:《吉林水利》2025年第3期7-12,共6页Jilin Water Resources

摘  要:本研究通过水工模型试验,针对新疆若羌县瓦石峡水库导流洞出现的泄流能力不足并存在吸气漩涡的问题,提出并验证了优化方案。优化后的方案,导流洞的下泄流量明显增大,且闸门门槽吸气漩涡消失。此研究成果对于提高水库工程的安全性和效率具有重要的意义,也为未来类似工程的设计和优化提供了宝贵经验和参考。In this study,an optimization scheme was proposed and verified to solve the problem of insufficient discharge capacity and suction vortex in the diversion tunnel of Washixia Reservoir in Ruoqiang County,Xinjiang.After the optimized scheme,the discharge rate of the diversion tunnel is significantly increased,and the suction vortex of the gate slot disappears.The results of this study are of great significance for improving the safety and efficiency of reservoir engineering,and also provide valuable experience and reference for the design and optimization of similar projects in the future.

关 键 词:导流洞 优化方案 模型试验 闸井 

分 类 号:TV652.2[水利工程—水利水电工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象