检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张明 Zhang Ming(China Academy of Building Research,Beijing 100013,China)
机构地区:[1]中国建筑科学研究院有限公司,北京100013
出 处:《山西建筑》2025年第7期63-67,共5页Shanxi Architecture
摘 要:以某斜抛撑深基坑的应急抢险为例,从施工单位因未按设计要求进行基坑降水和土方开挖、未经过设计许可超挖坑内留土,私自减小坑内留土宽度及高度等方面分析了导致基坑水平位移远远超出规范报警值的原因,论述了坑内回填土、增设临时斜支撑等应急措施,达到了保证基坑安全的效果。并对施工现场实际情况进行了施工模拟分析,提出了坑内留土保护措施的方法,希望为以后斜抛撑深基坑设计和施工提供借鉴与参考。This paper takes the emergency rescue of a deep foundation pit with oblique propped support as an example,discusses the construction unit because of the design requirements for foundation pit dewatering and earthwork excavation,without the design permission to excavate the pit to leave the soil,secretly reduce the width and height of the soil to leave the pit and other reasons cause the horizontal displacement of the foundation pit far exceeds the standard alarm value,expounds on the pit backfill soil,additional temporary oblique support and other emergency measures,to ensure the safety of the foundation pit.And the actual situation of the construction site for the construction simulation analysis,put forward the pit to leave the soil protection measures,hoping to provide reference for the future design and construction of deep foundation pit with oblique propped support.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222