检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:张俊[1] Zhang Jun(Kunming Survey,Design and Research Institute Co.,Ltd.of CREEC,Kunming Yunnan 650200,China)
机构地区:[1]中铁二院昆明勘察设计研究院有限责任公司,云南昆明650200
出 处:《山西建筑》2025年第7期117-120,共4页Shanxi Architecture
摘 要:丽江轨道交通1号线位于中国西南横断山区,定性为旅游轨道交通,在国内高海拔山区建设旅游轨道交通尚属首次。文中总结了项目具有地形地质条件复杂、高原生态脆弱、生态红线控制、地形陡峭、客流有周期性及潮汐性等特点,针对项目特点,提出车辆选型采用适应项目的高地板现代有轨电车方案,介绍了选线工作原则,比选了走廊带方案和局部方案,最终确定了项目平纵线型,对类似项目具有借鉴意义。Lijiang Rail Transit Line 1 is located in the Hengduan Mountains of southwest China,which is characterized as a tourist rail transit,and is the first time to build a tourist rail transit in a high-altitude mountainous area in China.It is summarized that the project has the characteristics of complex topographic and geological conditions,fragile plateau ecology,ecological red line control,steep terrain,light and tidal passenger flow,etc.,according to the characteristics of the project,the vehicle selection adopts the high-floor modern tram scheme suitable for the project,introduced the principles of line selection,compared the corridor belt scheme and the local scheme,and finaly determined the geology and terrain line selection,it can be used as a reference for similar projects.
分 类 号:TU997[建筑科学—市政工程] U412.3[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49