检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄斯拜 耿璐[1] 辛占德 崔小雄 HAUNG Sibai;GENG Lu;XIN Zhande;CUI Xiaoxiong
出 处:《中国矿山工程》2025年第1期44-49,62,共7页China Mine Engineering
摘 要:以某特大型铁矿主井井塔为例,对井塔结构设计过程进行探讨。阐述了超大型井塔平面和竖向布置过程,介绍了井塔的荷载取值与工况组合,给出了该井塔抗震不利情况的优化措施,利用YJK进行了小震弹性分析,采用MIDAS Building进行了验证,并以弹性时程分析作为补充计算。为后续超大型井塔的设计提供参考和帮助。Taking the main shaft tower of a certain super large iron mine as an example,this paper explores the design process of the shaft tower structure.This article elaborates on the process of arranging the plan and vertical layout of a super large well tower,introduces the load values and working condition combinations of the well tower,provides optimization measures for the seismic unfavorable situation of the well tower,uses YJK for small earthquake elastic analysis,verifies it using MIDAS Building,and supplements the calculation with elastic time history analysis.Provide reference and assistance for the design of super large well towers in the future.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:52.15.202.111