检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:Zhenguo Wang Hui Hou Chao Liu Shaohua Wang Zhengtian Li Xiangning Lin Te Li
机构地区:[1]Research Institute of State Grid Zhejiang Electric Power Company,Hangzhou 310014,PR China [2]School of Automation,Wuhan University of Technology,Wuhan 430070,PR China [3]State Key Laboratory of Advanced Electromagnetic Engineering and Technology,Huazhong University of Science and Technology,Wuhan 430074,PR China
出 处:《Global Energy Interconnection》2025年第1期121-133,共13页全球能源互联网(英文版)
基 金:supported in part by the National Nat-ural Science Foundation of China(52177110);Key Pro-gram of the National Natural Science Foundation of China(U22B20106,U2142206);Shenzhen Science and Technology Program(JCYJ20210324131409026);the Science and Technology Project of the State Grid Corpo-ration of China(5200-202319382A-2-3-XG);State Grid Zhejiang Elctric Power Co.,Ltd.Science and Tech-nology Project(B311DS24001A).
摘 要:Typhoons can cause large-area blackouts or partial outages of distribution networks.We define a partial outage state in the distribution network as a gray state and propose a gray-start strategy and two-stage distribution network emergency recovery framework.A phase-space reconstruction and stacked integrated model for predicting wind and photovoltaic generation during typhoon disasters is proposed in the first stage.This provides guidance for second-stage post-disaster emergency recovery scheduling.The emergency recovery scheduling model is established in the second stage,and this model is supported by a thermal power-generating unit,mobile emergency generators,and distributed generators.Distributed generation includes wind power generation,photovoltaics,fuel cells,etc.Simultaneously,we con-sider the gray-start based on the pumped storage unit to be an important first step in the emergency recovery strategy.This model is val-idated on the improved IEEE 33 node system,which utilizes data from the 2022 super typhoon“Muifa”in Zhoushan,Zhejiang,China.Simulations indicate the superiority of a gray start with a pumped storage unit and the proposed emergency recovery strategy.
关 键 词:Wind and photovoltaic generation prediction Pumped storage unit Gray-start Distribution network Emergency recovery strategy
分 类 号:TV743[水利工程—水利水电工程] TM61[电气工程—电力系统及自动化] TM73
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.15