修期管控措施在某型船首次二级修理的应用  

Application of Repair Period Control Measures in the First Secondary Repair of a Certain Type of Ship

在线阅读下载全文

作  者:杨瑞 YANG Rui(Guangzhou South China Shipyard,Guangdong 510715,China)

机构地区:[1]广州华南船舶修造厂,广东广州510715

出  处:《广东造船》2025年第1期109-111,共3页Guangdong shipbuilding

摘  要:近年来,修造企业竞争日趋激烈,船东对修造周期与质量的要求持续提升。本文通过某型船首次二级修理实施案例,系统应用修期管控措施,成功实现修理任务提前完成并达成降本增效目标,为同类型船舶修理管理提供可操作性经验。In recent years,competition in the ship repair industry has intensified,with shipowners continuously raising their demands for repair cycle time and quality.This study systematically applied repair period control measures through the implementation case of the first secondary repair on a certain type of ship,successfully completing the repair task ahead of schedule and achieving cost reduction and efficiency improvement goals,thereby providing actionable experience for the management of similar ship type repairs.

关 键 词:修期管控 二级修理 降本增效 

分 类 号:U673.2[交通运输工程—船舶及航道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象