双风轮风电机组过渡区两段式变桨距优化协调控制策略  

Optimization coordination control strategy for two-stage variable pitch in transition zone of dual-rotor wind turbine

作  者:佘淋淋 胡书举[1] 孟岩峰[1] 宋斌[1,2] 冯帅 SHE Linlin;HU Shuju;MENG Yanfeng;SONG Bin;FENG Shuai(Institute of Electrical Engineering,Chinese Academy of Sciences,Beijing 100190,China;University of Chinese Academy of Sciences,Beijing 100049,China)

机构地区:[1]中国科学院电工研究所,北京100190 [2]中国科学院大学,北京100049

出  处:《电力自动化设备》2025年第3期72-77,共6页Electric Power Automation Equipment

基  金:青岛市关键技术攻关及产业化示范类项目(22-3-3-hygg-26-hy);内蒙古自治区科技重大专项(2021ZD0027);内蒙古自治区“揭榜挂帅”项目(2022JBGS0005)。

摘  要:在满足载荷平衡和稳定运行条件的基础上,为减小双风轮风电机组在过渡区的疲劳载荷,并确保双风轮协调配合以达到最佳功率,提出基于原始-对偶内点法的过渡区两段式变桨距优化协调控制策略。在MATLAB/Simulink中通过阶跃风验证了所提策略的快速性和准确性。进一步建立湍流风模型下的双风轮风电机组并网仿真系统,验证了所提策略的可行性。设置评价指标量化对比所提策略与普通变桨控制,结果表明采用所提策略可缩短过渡区超速时间,减小疲劳载荷,有效降低过载程度。On the basis of satisfying load balance and stable operation condition,in order to reduce the fatigue load in the transition zone of dual-rotor wind turbine and ensure the coordination between two rotors for optimal power,an optimization coordination control strategy for two-stage variable pitch in transi-tion zone is proposed based on the primal-dual interior point method.The rapidity and accuracy of the pro-posed strategy are verified through step wind simulation in MATLAB/Simulink.Further,a grid-connected simulation system of dual-rotor wind turbine under turbulent wind model is built,verifying the feasibility of the proposed strategy.An evaluation index is set to quantitatively compare the proposed strategy and the common variable pitch control,and the results show that the proposed strategy can shorten the overspeed time in the transition zone,reduce the fatigue load,and effectively mitigate the overload degree.

关 键 词:双风轮风电机组 载荷平衡 疲劳载荷 过渡区 两段式变桨距 评价指标量化 

分 类 号:TM614[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象