海洋工程建造项目工时管理应用研究  

Research on the Application of Time Management in Marine Engineering Construction Projects

在线阅读下载全文

作  者:游泰山 YOU Taishan(Offshore Oil Engineering(Qingdao)Co.,Ltd.,Qingdao 266520,China)

机构地区:[1]海洋石油工程(青岛)有限公司,山东青岛266520

出  处:《化工管理》2025年第6期1-3,共3页Chemical Management

摘  要:在海洋工程建造领域,有效的工时管理是保证项目建造成功和按时交付的关键。管理人员需要及时对建造过程中发生的工时进行统计汇总,为人力计划、费用控制和进度管理提供准确合理的数据支持,以此来优化工时、降低成本、提高生产效率,最终帮助建造项目能够高效、经济完成。In the field of offshore engineering construction,effective man-hour management is the key to ensuring the success and timely delivery of project construction.Management personnel need to timely collect and summarize the working hours that occur during the construction process,providing accurate and reasonable data support for manpower planning,cost control,and schedule management,in order to optimize working hours,reduce costs,improve production efficiency,and ultimately help the construction project to be completed efficiently and economically.

关 键 词:海洋工程 建造 工时管理 

分 类 号:F245[经济管理—劳动经济]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象