检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钱承浩 QIAN Chenghao(Shanghai Construction and Building Materials Industry Market Management Station,Shanghai 200032,China)
机构地区:[1]上海市建筑建材业市场管理总站,上海200032
出 处:《建筑经济》2025年第3期64-68,共5页Construction Economy
摘 要:本文通过识别影响建筑安装工程工期的主要因素,利用工期定额数据对工期进行二元一次线性回归分析,从而建立了39个工期计算模型,对工期定额修编数据采集、整理、规范、分析具有指导作用;亦可以用于定额工期趋势外推和合理工期测算,对合理工期的确定具有积极作用和重要价值,有助于提升工程项目的管理水平和效率。This study identifies key factors influencing the duration of construction and installation engineering projects.Using quota duration data,a binary linear regression analysis was conducted to establish 39 duration calculation models.These models provide guidance for data collection,organization,standardization,and analysis during the revision of quota durations.They also enable trend extrapolation of quota durations and estimation of reasonable project timelines,offering significant value in determining scientifically justified schedules.This research contributes to enhancing project management efficiency and effectiveness.
分 类 号:F407.9[经济管理—产业经济] TU723.3[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.21.106.4