摘  要:鉴于银江水电站砂石加工系统骨料料源发生了重大变更,导致使用原设计的系统生产工艺加工新料源出现了生产效率降低、成品骨料质量差、废水处理系统回收效果不佳、生产成本提高等诸多问题,因此,必须对砂石加工系统的生产工艺进行调整以适应新料源的加工。阐述了对砂石加工系统生产工艺进行的调整。With the dramatic changes in the aggregate source of the sandstone processing system at Yinjiang Hydropower Project,the original system that applied to produce and process new material sources has resulted in many problems such as low productivity,poor quality of made aggregates,the ineffective feedback of wastewater treatment systems,and increased production costs.Therefore,it is necessary to adjust the system process to adapt to the processing of new material sources.This paper describes the adjustments made to the production process of the sand and gravel processing system.

关 键 词:银江水电站 砂石加工系统 料源 重大变更 质量不达标 工艺调整 

分 类 号:TV7[水利工程—水利水电工程] TV51TV52

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象