锅浪跷水电站砂石加工系统建设经验与教训  

Experience and Lessons Learned from the Construction of Sand and Stone Processing System of Guolangqiao Hydropower Project

作  者:柳启超 伍舰 LIU Qichao;WU Jian(Sichuan Ertan International Engineering Consulting Co.,Ltd.,Chengdu Sichuan 611130)

机构地区:[1]四川二滩国际工程咨询有限责任公司,四川成都611130

出  处:《四川水力发电》2025年第1期158-163,共6页Sichuan Hydropower

摘  要:锅浪跷水电站砂石加工系统由于前期规划与设计的不充分,系统建成后在运行过程中存在垫层料生产线、米石生产线、废水处理系统缺失等一系列制约砂石骨料生产的问题。笔者就该工程砂石系统的建设和运行情况、存在的问题和相关问题的处理等进行介绍,并就相关经验和教训进行总结,能够对水电工程砂石加工系统的建设起到一定的借鉴和警示作用。Due to the inadequacy of the preliminary planning and design of the sand and gravel processing system of Guolangqiao Hydropower Project,there are a series of problems restricting the production of sand and gravel aggregate during the operation of the system after its completion,such as the lack of bedding production line,rice stone production line and waste water treatment system.This paper introduces the construction and operation of the sand and gravel system,the existing problems and the treatment of related problems.The relevant experience and lessons are summarized.It is hoped that it can play a role of reference and warning to the construction of sand and gravel processing system in hydropower projects.

关 键 词:砂石加工 垫层料 米石加工生产线 废水处理系统 

分 类 号:P619.228[天文地球—矿床学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象