检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李泉 黄鑫 黄金山 LI Quan;HUANG Xin;HUANG Jinshan(Yalong River Hydropower Development Co.,Ltd.,Chengdu Sichuan 610051)
机构地区:[1]雅砻江流域水电开发有限公司,四川成都610051
出 处:《四川水力发电》2025年第1期168-172,共5页Sichuan Hydropower
摘 要:某水电站单机容量、总装机规模及引用流量均较大,超长引水式开发且利用水头较高,上游调压室过渡过程工况压差较高,涌浪衰减较慢,水力学条件极为复杂。电站运行方式应遵循长距离引水式电站的水力瞬变规律和"安全、稳妥"的原则,为保障电站水工建筑物及电网安全运行,研究了机组在单机运行甩负荷试验及事故情况下紧急调整负荷等工况下,引发长引水隧洞调压室水位波动的周期特点,提出了根据上游调压室涌浪水位波动情况调整机组负荷的方法。The unit capacity,total installation machine scale and reference flow of a hydropower are relatively large with ultra long water diversion development,and the utilization water head is relatively high.The pressure difference during the transition process of the upstream surge chamber is relatively high,the surge attenuation is slower,and the hydraulic conditions are extremely complex.The method of operation of the project shall follow the hydraulic transient law of hypropower projects with long distance diversion and the principle of"safety and stability".To ensure the safe operation of hydraulic structures and power grids,this article studies the periodic characteristics of water level fluctuations in the surge chamber of a long diversion tunnel caused by single unit load rejection tests and emergency load adjustment in case of accidents,proposed a method to adjust the unit load based on the fluctuation of surge water level in the upstream surge chamber.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.33