风电场35 kV升压站雷击事故案例分析  

Case Analysis of Lightning Stroke Accident in 35 kV Booster Station of Wind Farm

作  者:瞿笑 陈海文 余兵 王俊阳 周文钰 周道刚 QU Xiao;CHEN Haiwen;YU Bing;WANG Junyang;ZHOU Wenyu;ZHOU Daogang(Qiannan Meteorological Bureau,Duyun 558000,China;Bijie Meteorological Bureau,Bijie 551700,China;Zunyi Meteorological Bureau,Zunyi 563001,China;Guizhou Lightning Protection Technology Service Co.,Ltd.,Guiyang 550002,China;Guizhou Meteorological Disaster Prevention Centre,Guiyang 550002,China)

机构地区:[1]黔南州气象局,贵州都匀558000 [2]毕节市气象局,贵州毕节551700 [3]遵义市气象局,贵州遵义563001 [4]贵州雷电防护科技服务有限公司,贵州贵阳550002 [5]贵州省气象台,贵州贵阳550002

出  处:《现代建筑电气》2025年第1期28-34,共7页Modern Architecture Electric

基  金:贵州省科技计划项目(黔科合基础ZK[2022]一般245)。

摘  要:对某风电场35 kV升压站内35 kV接地变压器遭雷击烧毁事件进行分析。风电场架空敷设35 kV集电线路转铠装电缆进入升压站时,终端杆转换位置存在雷电感应过电压传导转移、高压避雷器不能正常工作等问题,分析发现雷电感应过电压传导是升压站内35 kV接地变压器雷击烧毁、雷雨天气时多次跳闸的主要原因。遵循相关技术规范,提出了雷电感应过电压传导电气隔断技术思路,建议将终端杆位置架空避雷线独立接地、35 kV铠装电缆金属护导层单独接地,架空避雷线、铠装电缆金属护导层接地引下线屏蔽敷设。结果可供同类项目参考。The incident of a 35 kV grounding transformer being struck and burned out in a 35 kV substation of a wind farm is analyzed.When the overhead laying of 35 kV collection lines in the wind farm is converted into armored cables and enters the substation,there are problems such as lightning induced overvoltage conduction and transfer at the terminal pole conversion position,and the high-voltage lightning arrester cannot work normally.It shows that lightning induced overvoltage conduction is the main reason for the 35 kV grounding transformer in the substation being burned out by lightning strikes and tripping multiple times during thunderstorm weather.Following relevant technical specifications,a technical concept for lightning induced overvoltage conduction electrical isolation has been proposed.It is suggested to independently ground the overhead lightning protection line at the terminal pole position,ground the metal protective layer of the 35 kV armored cable separately,and shield the grounding lead of the overhead lightning protection line and armored cable metal protective layer.The results can be used as a reference for similar projects.

关 键 词:风电场35 kV升压站 接地变压器 过电压传导转移 电气隔断 

分 类 号:TU895[建筑科学]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象