全断面富水砂层土压平衡盾构施工分析  

Analysis on Earth Pressure Balance Shield Construction in Full Face Water-rich Sand Layer

在线阅读下载全文

作  者:武景存 WU Jingcun(China Railway 15th Bureau Group Underground Engineering Co.,Ltd.,Yangzhou 225000,Jiangsu,China)

机构地区:[1]中铁十五局集团地下工程有限公司,江苏扬州225000

出  处:《工程技术研究》2025年第2期86-88,共3页Engineering and Technological Research

摘  要:在地铁施工建设中,盾构法是常用的掘进方法。盾构机在富水砂层掘进时,由于细颗粒较少,很难使土仓渣土具备良好的塑性,从而影响螺机的土塞效应,且粉砂与粉土地层的地下水具有承压性,施工过程中易产生喷涌、地表沉降等问题。因此,文章以郑州市轨道交通4号线土建02标两个盾构区间施工工程为例,详细阐述了土压平衡盾构在富水砂层中施工控制措施和解决方法,以便为同类项目的顺利开展提供参考。Shield method is a common tunneling method in subway construction.When the shield machine is tunneling in the water-rich sand layer,it is difficult to make muck in the soil bin have good plasticity due to the small number of fine particles,thus affecting the soil plug effect of the screw conveyor,and the groundwater in the silt layers is pressure-bearing,which is easy to produce problems such as gushing and surface settlement during construction.Therefore,this paper takes the construction engineering of two shield intervals of the civil engineering 02 bid on Zhengzhou Rail Transit Line 4 as an example to elaborate the construction control measures and solutions of the earth pressure balance shield in the water-rich sand layer,so as to provide reference for the smooth development of similar projects.

关 键 词:地质条件 富水砂层 土压平衡 盾构法施工 

分 类 号:U455.43[建筑科学—桥梁与隧道工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象