作 者:龚雄 李娜 GONG Xiong;LI Na(SDIC Shanxi New Energy Co.,Ltd.,Xi'an 710000;Lanzhou Dacheng Technology Co.,Ltd.,Lanzhou 730000)
机构地区:[1]国投陕西新能源有限公司,陕西西安710000 [2]兰州大成科技股份有限公司,甘肃兰州730000
出 处:《电力安全技术》2025年第2期63-68,共6页Electric Safety Technology
摘 要:针对某50 MW槽式光热示范电站集热器出现的支撑基座变形、集热器转动速率快保护频繁动作、集热器拒动故障,通过现场排查、系统分析和试验验证等方法,找出异常的原因,并分别研究提出了多项治理方案。综合技改成本、预期效果、施工难度、施工周期及其他优缺点,选取可行性最优的方案开展技术改造,提升了集热器的运行可靠性和电站的发电能力。In allusion to the failures occurred in the heat collectors of a 50 MW trough solar-thermal power station including the deformation of support bases,fast rotation rate of collectors leading to frequent protection actions,and collector failure to operate.By means of on-site investigation,system analysis and test verification,etc.,the anomaly causes are found out,and the corresponding multiple management schemes are proposed based on study.With the comprehensive consideration of technical transformation costs,expected effects,construction difficulty,construction period as well as other strong and weak points,an optimal feasible scheme is selected to carry out the technical transformation,which improves the running reliability of heat collectors and the power generation capacity of the power station.
分 类 号:TM07[电气工程—电工理论与新技术]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.200