检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:史义雄[1] 张素婷[1] SHI Yixiong;ZHANG Suting(China Railway SIYUAN Survey and Design Group Co.,Ltd.,Wuhan 430063,China)
机构地区:[1]中铁第四勘察设计院集团有限公司,武汉430063
出 处:《给水排水》2024年第S1期12-16,共5页Water & Wastewater Engineering
摘 要:针对铁路下凹隧道工程设计标准不够详细的现状,根据下凹隧道工程特点,从隧道洞外截排水、洞口接线段雨水排水和洞内废水排水三方面,对排水工程设计参数进行了分析,并探讨了泵房自控仪表及视频监控系统的设置,提出了隧道机械排水系统故障处理遵循不影响行车、天窗点处理的原则以及日常运维管理要求。The current design standards for underpass railway tunnel engineering are not detailed enough.Based on the characteristics of the underpass tunnel,the design parameters of drainage engineering were analyzed from three aspects:external interception and drainage,rainwater drainage of the entrance section,and wastewater drainage inside the tunnel.The installation strategy of automatic control instruments and video monitoring systems in the pump room were discussed.It is proposed to follow the principle of not affecting driving and handling at‘skylight time’in the maintenance of tunnel mechanical drainage systems.The requirements for daily operation and maintenance were also illustrated.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117