检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:钟益斌 罗舒怀 ZHONG Yibin;LUO Shuhuai(PowerChina Ecological Environment Group Co.,Ltd.,Shenzhen 518100,China)
机构地区:[1]中电建生态环境集团有限公司,深圳518100
出 处:《给水排水》2024年第S1期441-446,共6页Water & Wastewater Engineering
摘 要:以深圳市龙岗区龙西河流域为对象,通过系统梳理流域水环境现状,分析评估已建初期雨水径流污染控制设施,长时间序列历史降雨综合分析,梳理流域系统初期雨水收集缺口,并利用SWMM模型对流域整体水污染现状进行模拟,结合模型模拟结果进行查漏补缺,确定方案布局,从源头-过程-末端提出适宜于龙西河流域的初期雨水径流污染控制削减方案。Based on a systematic review of the water environment of the Longxi River basin in Longgang District,Shenzhen,this paper analyzes and evaluates the pollution control facilities of the early stormwater runoff,and makes a comprehensive analysis of historical rainfall over a long period of time,in this paper,the gap of rainwater collection in the early stage of a watershed system is analyzed,and the SWMM model is used to simulate the whole water pollution situation of the watershed,from the source-process-end of the Longxi River basin proposed suitable for the initial storm runoff pollution control and reduction program.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.191.152.135