国内外核电厂暗取取水头部调研及取水安全分析  

Investigation and safety analysis of deep water intake head in domestic and foreign nuclear power plants

在线阅读下载全文

作  者:曹冉冉 杨嘉 CAO Ranran;YANG Jia(China Nuclear Power Engineering Co.,Ltd.,Beijing 100840,China)

机构地区:[1]中国核电工程有限公司,北京100840

出  处:《给水排水》2024年第S1期650-654,共5页Water & Wastewater Engineering

基  金:中国核电工程有限公司自立科研项目(KY22068)

摘  要:针对国内外核电厂多种暗取取水头部展开调研,从暗取取水工程所在海域的水动力特征及取水型式的水力特性角度出发,分析了暗取取水堵塞致灾物及潜在致灾物的主要特征,总结了暗取取水致灾风险,对暗取取水安全进行了分析。并且进一步对暗取取水安全保障措施进行了调研,为基于水动力的暗取取水主动导避技术研发提供基础依据。In this paper,a survey was carried out on a variety of underground water intake heads in domestic and foreign nuclear power plants.From the perspective of hydrodynamic characteristics of the sea area where the underground water intake project is located and hydraulic characteristics of the water intake type,the main characteristics of the disaster hazards and potential disaster hazards for underground water intake were analyzed.The disaster risks for underground water intake were summarized,and the safety of underground water intake was analyzed.Moreover,a further research on the security measures of underground water intake was carried out to provide a basis for the research and development of the active guide technology of underground water intake based on hydraulic dynamics.

关 键 词:滨海核电厂 暗取取水 取水安全 

分 类 号:TM623[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象