检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:章辉 ZHANG Hui(Sinohydro Bureau 11 Co.,Ltd.,Zhengzhou 450001,Henan,China)
机构地区:[1]中国水利水电第十一工程局有限公司,河南郑州450001
出 处:《水利水电技术(中英文)》2024年第S2期908-910,共3页Water Resources and Hydropower Engineering
摘 要:大中型水利水电工程中砂石料用量大、使用周期伴随施工全过程,且为非标准包装产品,作为项目物资材料管理重点之一,日常收方计量工作对于供、需双方都十分重要,计量偏差所带来的影响较大,因此其精度要求较高。整理了所使用的计量方法,及其特点和适用范围,提出全新的称重扣水法,可为类似砂石料收方计量提供参考和借鉴。In large and medium-sized water conservancy and hydropower projects,the amount of sand and gravel materials used is large,the usage cycle accompanies the entire construction process,and they are non-standard packaging products.As one of the key points of project material management,daily collection and measurement work is very important for both supply and demand sides.The impact of measurement deviation is significant,so its accuracy requirements are high.Measurement method used were summarized and analyzed with their characteristics,and scope of application.A new weighing and water deduction method was proposed,which can provide reference and inspiration for similar sand and gravel volume measurement.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.7