检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘宁波[1] 袁超 周清忘 Liu Ning-bo;Yuan Chao;Zhou Qing-wang(The Second Shipping Engineering Bureau of China Communications Co.,Ltd.,430014,Wuhan,China;Henan Yuxi Expressway Co.,Ltd.,450000,Zhengzhou,China)
机构地区:[1]中交第二航务工程局有限公司,武汉430014 [2]河南省豫淅高速公路有限公司,郑州450000
出 处:《建筑技术》2025年第5期565-569,共5页Architecture Technology
摘 要:针对生态库区水中承台施工相对复杂的施工环境,常规的承台施工不满足现场施工条件,且涉水区域属于生态环境敏感区。在保证环保的情况下,采用钢吊箱施工技术,通过钢吊箱下放、封底混凝土浇筑、钢吊箱抽水、桩头处理、承台钢筋绑扎、承台混凝土浇筑,大体积混凝土温控等技术实现了水中承台的施工。研究依托渑淅高速项目关防大桥19号墩水中承台工程实例,对相关施工工艺进行详细阐述。In view of the relatively complex construction environment of underwater cap construction in ecological reservoir area,the conventional cap construction does not meet the site construction conditions,and the wading area belongs to the ecological environment sensitive area.In the case of ensuring the environment,a steel hanging box construction technology is adopted to realize the construction of the water cap by lowering the steel hanging box,sealing the concrete pouring,pumping the steel hanging box,pile head treatment,cap reinforcement binding,cap concrete pouring,mass concrete temperature control,etc.Based on the example of Guanfang Bridge No.19 pier underwater cap engineering,this study expounds the related construction technology in detail.
分 类 号:U445.4[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.222