检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:杨志刚 贾宁 乔建伟 YANG Zhigang;JIA Ning;QIAO Jianwei(China CAMC Engineering Co.,Ltd.,Beijing 100080,China;China JIKAN Research Institute of Engineering Investigations and Design Co.,Ltd.,Xi′an 710043,China;Shaanxi Laboratory for the Property and Treatment of Special Soil and Rock,Xi′an 710043,China)
机构地区:[1]中工国际工程股份有限公司,北京100080 [2]机械工业勘察设计研究院有限公司,陕西西安710043 [3]陕西省特殊岩土性质与处理重点实验室,陕西西安710043
出 处:《水利水电快报》2025年第3期33-39,共7页Express Water Resources & Hydropower Information
基 金:陕西省创新能力支撑计划项目(2023-CX-TD-34,2022-KJXX-05,2023-CX-PT-46);西安市英才计划青年项目(2022XAYC-03);国机集团青年科技基金项目(QNJJ-PY-2022-41,QNJJ-ZD-2022-17)。
摘 要:尼泊尔工程地质条件复杂,工程建设面临多种地质灾害威胁。通过收集文献,初步分析了尼泊尔的地质构造、地形地貌、地层岩性、水文地质条件和不良地质现象等工程地质条件。结果表明:①尼泊尔4条近东西向断裂可将其划分为5个构造单元;②尼泊尔地形起伏大,可划分为8个不同的地貌单元;③发源于青藏高原的8条主要河流在纵向上将尼泊尔划分为六大流域;④对工程建设造成不利影响的不良地质现象主要包括地震、崩塌、滑坡和泥石流等,在工程建设初期应充分评价地震及“崩滑流”对建设场地的不利影响,重点项目建议开展专项研究。研究成果可为尼泊尔工程建设提供技术支撑。The complex engineering geological conditions of Nepal may lead to the risk of geological disaster for project construction.The engineering geological conditions of Nepal,such as geological structure,topography,lithology,hydro-geological conditions,and adverse geological phenomena,etc.,was analyzed by collecting literature.The results showed that:①4 faults,with nearly east-west strike,can divide Nepal into 5 longitudinal geological zones distributed from north to south.②The landform of Nepal undulates terribly,and the territory of Nepal can be divided into 8 roughly parallel geomorphic regions.③8 rivers,running out of Qinghai-Xizang Plateau,can divide Nepal into 6 transverse physiographic regions.④The harmful engineering phenomena that have a negative impact on engineering construction in Nepal mainly include earthquakes,collapses,landslides and mudslide,etc.The adverse effects of earthquakes,collapses,landslides and mudslide on construction sites should be fully evaluated in the site selection stage of construction projects,and special studies were suggested for key projects.The research results could be a technical support for engineering construction in Nepal.
分 类 号:P642.4[天文地球—工程地质学] TV221.2[天文地球—地质矿产勘探]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49