拟静力试验后受损装配式框架节点的加固与性能分析  

Experimental Study on Reinforcing Damaged Prefabricated Frame Joints After Pseudo-static Test by New Prestressed Wire Rope

在线阅读下载全文

作  者:田安国 姚浩然 蒋德稳 刘瑞 周人伟 胡文硕 TIAN Anguo;YAO Haoran;JIANG Dewen;LIU Rui;ZHOU Renwei;HU Wenshuo(School of Civil and Ocean Engineering,Jiangsu Ocean University,Lianyungang 222000,China;NO.2 Construction Co.Ltd.of China Construction Fifth Engineeering Bureau,Hefei 230000,China)

机构地区:[1]江苏海洋大学土木与港海工程学院,江苏连云港222000 [2]中建五局第二建设有限公司,安徽合肥230000

出  处:《天津建设科技》2025年第1期48-52,共5页Tianjin Construction Science and Technology

摘  要:通过加固拟静力试验后受损的装配式框架节点,评估了新型预应力钢丝绳加固法在装配式框架抗震加固中的应用效果。试验结果表明:预应力钢丝绳加固法的施工工艺简单,关键部件可在工厂预制批量生产,加固效率显著提高。预应力钢丝绳加固后的受损装配式框架在滞回曲线、骨架曲线、刚度退化、耗能能力、残余变形等关键指标上均展现出良好的性能,特别是在增强结构的刚度和承载力方面表现突出。In this paper,the application effect of the new prestressed wire rope reinforcement method in the seismic reinforcement of the prefabricated frame is evaluated by strengthening the joints damaged after the pseudo-static test.The test results show that the construction process of the prestressed steel wire rope reinforcement method is simple,and the key components can be mass-produced in the factory,and the reinforcement efficiency is significantly improved.The prestressed steel wire rope reinforced damaged prefabricated frame shows good performance in hysteretic curve,skeleton curve,stiffness degradation,energy dissipation capacity,residual deformation and other key indexes,especially in strengthening the stiffness and bearing capacity of the structure.

关 键 词:装配式框架结构 预应力钢丝绳 抗震性能 

分 类 号:TU375.4[建筑科学—结构工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象