作 者:姚锐丹 YAO Rui-dan(The Fourth Engineering Co.Ltd.ofCCCCFirst Highway Engineering Co.Ltd.,Nanning 530033,China)
机构地区:[1]中交一公局第四工程有限公司,南宁530033
出 处:《工程建设与设计》2025年第4期16-18,共3页Construction & Design for Engineering
摘 要:某工程原边坡受红线限制,削坡空间有限,导致内侧形成了较高陡的边坡,且经过3年多的运行,受雨水的冲刷,该高边坡段落局部出现了崩塌,需要进行治理。工程采用钢管桩+混凝土支撑梁方案进行治理,并对正常蓄水工况、设计洪水位降落工况和正常蓄水遭遇地震工况3种工况进行有限元分析。结果显示,均满足稳定性要求,治理方案有效。The original slope of a project is limited by the red line and the space for cutting slope is limited,which leads to the formation of a high and steep slope inside.After more than three years of operation,the high slope section partially collapsed due to the erosion of rain,which needs to be treated.This project adopts the steel pipe pile+concrete support beam scheme for treatment,and carries out finite element analysis on the normal water storage condition,the design flood level fall condition and the normal water storage earthquake condition.The results show that the stability requirements are met and the treatment scheme is effective.
分 类 号:TV223[水利工程—水工结构工程] TV311
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49