检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李青友 LI Qing-you(Sinohydro Bureau 16 Co.Ltd.,Fuzhou 350001,China)
机构地区:[1]中国水利水电第十六工程局有限公司,福州350001
出 处:《工程建设与设计》2025年第4期112-114,共3页Construction & Design for Engineering
摘 要:以国外高速公路隧道开挖支护施工项目为例,详细介绍了隧道超前支护与初期支护技术,针对隧道塌方问题,实施了顶板沉降孔处理和支护加固措施,确保了隧道结构的安全性和稳定性。通过精确的监测和及时的施工调整,该项目有效控制了施工风险,确保了隧道的顺利开挖与后续施工。Taking highway tunnel excavation support construction project abroad as an example,the tunnel advance support and initial support technology are introduced in detail.In view of tunnel collapse problem,the roof settlement hole treatment and support reinforcement measures are implemented to ensure the safety and stability of tunnel structure.Through accurate monitoring and timely construction adjustment,the project effectively controlled the construction risk and ensured the smooth excavation and subsequent construction of the tunnel.
分 类 号:U455.7[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.147