检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘鹏 LIU Peng(China Railway 14th Bureau Group Electrification Engineering Co.Ltd.,Ji’nan 250014,China)
机构地区:[1]中铁十四局集团电气化工程有限公司,济南250014
出 处:《工程建设与设计》2025年第4期145-147,共3页Construction & Design for Engineering
摘 要:对电力沟槽和接线盒施工工艺优化及其对承载式光伏路面的影响进行了研究。针对电力沟槽施工,提出分层开挖、设置U形排水管,以及采用喷浆加固技术提高沟槽壁强度与耐久性等优化措施;针对接线盒施工工艺,进行了线缆预处理和接线盒预埋及固定方式的改良。此外,在实际承载式光伏路面工程案例中评估了电力沟槽和接线盒施工工艺优化前后的效果,以展示优化措施对承载式光伏路面性能以及电力传输系统的具体影响。For the construction of power trench,the paper puts forward some optimization measures,such as excavation by layers,setting U-shaped drainage pipe,and strengthening the trench wall with shotcrete technology.According to the construction technology of junction box,the cable pretreatment and the way of embedding and fixing of junction box are improved.In addition,the effects before and after the optimization of the construction process of the power trench and junction box were evaluated in the actual case of the bearing photovoltaic pavement project to demonstrate the specific impact of the optimization measures on the performance of the bearing photovoltaic pavement and the power transmission system.
分 类 号:TM757.3[电气工程—电力系统及自动化] TM615
正在载入数据...