检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:牟禾平 Mu Heping(CCCC Third Harbor Engineering Co.,Ltd.Xiamen Branch,Xiamen,China)
机构地区:[1]中交第三航务工程局有限公司厦门分公司,福建厦门
出 处:《科学技术创新》2025年第7期88-91,共4页Scientific and Technological Innovation
摘 要:路桥过渡段路基沉降病害频发,易引发桥头跳车,导致行车不稳,造成交通事故。文章简要分析路桥过渡段路基沉降原因,结合工程情况,制定路基沉降填土方案,提出施工措施。结果表明,工程采取8%石灰土掺入填土,严格控制施工要点,能够提高抗压强度,减少压缩系数与最大干密度,满足工程要求。The frequent occurrence of roadbed settlement diseases in the transition section of roads and bridges can easily lead to vehicle jumping at the bridgehead,resulting in unstable driving and causing traffic accidents.The article briefly analyzes the causes of roadbed settlement in the transition section of roads and bridges,and based on the engineering situation,formulates a roadbed settlement filling plan and proposes construction measures.The results show that by adding 8%lime soil to fill soil and strictly controlling the construction points,the compressive strength can be improved,the compression coefficient and maximum dry density can be reduced,and the engineering requirements can be met.
分 类 号:U416.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49