考虑站网协调的变电站多阶段规划模型  

A Multi-stage Planning Model for Substations Considering Station Network Coordination

在线阅读下载全文

作  者:陈宇昇[1] 冯玉辉 鄢露 黄智聪 蔡润庆 CHEN Yusheng;FENG Yuhui;YAN Lu;HUANG Zhicong;CAI Runqing(Guangzhou Power Supply Bureau of Guangdong Power Grid Company,Guangzhou Guangdong 510013)

机构地区:[1]广东电网公司广州供电局,广东广州510013

出  处:《中国科技纵横》2025年第1期141-143,共3页China Science & Technology Overview

摘  要:传统的变电站规划模型存在不全面性。基于此,本文提出考虑站网协调的变电站多阶段规划模型。首先对该模型进行设计,包括创建元件的状态模型,基于所创建的元件状态模型提取变电站多阶段规划变量,然后构建考虑站网协调的目标函数,最终建立变电站多阶段规划模型。为验证该模型的有效性,将其与基础变电站规划模型及基于布点定容的变电站多阶段规划模型进行对比。结果表明,考虑站网协调的变电站多阶段规划模型更为有效。The traditional substation planning model is not comprehensive.Therefore,this paper proposes a multi-stage planning model for substations considering station-network coordination.Firstly,the model is designed,including creating a state model of components,extracting the multi-stage planning variables of the substation based on the created component state model,and then constructing an objective function considering the coordination of the station network,and finally establishing the multi-stage planning model of the substation.In order to verify the effectiveness of the model,comparative experiments are carried out to compare it with the basic substation planning model and the multi-stage planning model of substation based on distribution and capacity setting,and the results show that the multi-stage planning model of substation considering station-network coordination is more effective.

关 键 词:站网协调 变电站 多阶段 规划模型 

分 类 号:TM727[电气工程—电力系统及自动化]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象