检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:刘磊 Liu Lei
出 处:《江苏建材》2025年第1期7-9,共3页Jiangsu Building Materials
摘 要:新建北京至唐山铁路,正线长约148.7 km。为了确保工程安全质量,加强施工标准化管理,以及减少施工对环境的影响,京唐铁路项目5个标段实行小型预制构件联合建场,根据工程项目标段划分、工程量大小等特性,综合考虑施工进度、标段间距、成本控制、质量控制、环保等因素,选择辐射各标段距离最佳点做为联合建场首选位置,以点带线,达到工程建设质量优良、工期可控、成本节约、各环节匹配协调等目标。The newly built Beijing Tangshan railway has a main line length of approximately 148.7 kilometers.In order to ensure the safety and quality of the project,strengthen standardized construction management,and reduce the impact of construction on the environment,the five sections of the Jingtang Railway project have implemented small-scale prefabricated component joint construction sites.Based on the characteristics of the project section division and the size of the project,comprehensive consideration is given to factors such as construction progress,section spacing,cost control,quality control,and environmental protection.The optimal point that radiates the distance between each section is selected as the preferred location for joint construction sites,with points leading to lines,to achieve the goals of excellent construction quality,controllable construction period,cost savings,and coordinated matching of various links.
分 类 号:TK223.1[动力工程及工程热物理—动力机械及工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49