新型煤化工项目厂外来煤运输方案的选择  

Selection of Incoming Coal Handling Scheme for New Coal Chemical Projects

在线阅读下载全文

作  者:李伟 LI Wei(China Sinogy Electric Engineering Co.,Ltd.,Handan 056002,China)

机构地区:[1]中机国能电力工程有限公司,河北邯郸056002

出  处:《硫磷设计与粉体工程》2024年第6期16-20,I0001,共6页Sulphur Phosphorus & Bulk Materials Handling Related Engineering

摘  要:合理确定厂外来煤运输方案对保证煤化工项目的安全运行、节省投资、降低运行成本至关重要。以某5400 kt/a煤制油项目一期工程为例,阐述了适用该项目厂外来煤运输方案——汽车输送和长距离曲线带式输送机输送,并对这两种运输方案进行了技术经济比较,认为采用长距离曲线带式输送机运输方案更合适。Proper selection of incoming coal handling scheme is vital for ensuring the safe operation of coal chemical projects,minimizing capital expenditure and operating expenditure.Taking the first phase of a 5400 kt/a coal-to-liquid project as an example,the incoming coal handling schemes applicable to the project,namely by truck and by long-distance curved belt conveyor,are presented,and a technoeconomics comparison of the two schemes is made.It is concluded that the long-distance curved belt conveyor scheme is preferred.

关 键 词:煤化工项目 厂外运输方案 汽车运输 输送机运输 技术经济比较 

分 类 号:TB498[一般工业技术] TQ536.1[化学工程—煤化学工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象