检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:黄晓鸣 李悦 戚端骏 HUANG Xiaoming;LI Yue;QI Duanjun(Shanghai Tunnel Engineering&Rail Transit Design and Research Institute,Shanghai 200235,China;Transportation&Economics Research Institute,China Academy of Railway Sciences Corporation Limited,Beijing 100081,China;Shanghai Shentong Metro Group Co.,Ltd.,Shanghai 201103,China)
机构地区:[1]上海市隧道工程轨道交通设计研究院,上海200235 [2]中国铁道科学研究院集团有限公司运输及经济研究所,北京100081 [3]上海申通地铁集团有限公司,上海201103
出 处:《现代城市轨道交通》2025年第3期124-129,共6页Modern Urban Transit
基 金:中国铁道科学研究院集团有限公司基金课题(2022YJ313)。
摘 要:为适应城市轨道交通设施设备建设安装与运营需求,多个省市相继出台城市轨道交通工程概(预)算定额。然而,城市轨道交通运营设施设备大修概算定额编制方面仍存在不足,如发布数量少、地区差异大、与新建定额区分度低等。为进一步完善工程计价依据体系,实现城市轨道交通运营企业降本增效的目标,编制城市轨道交通运营设施设备大修概算定额显得尤为重要。在大修定额编制过程中,明确主要内容和解决重难点问题是关键,通过收集可靠的支撑依据和开展实际测算相结合的方式,可增强定额编制的科学性和实用性。文章以上海市轨道交通为例,编制设施设备大修概算定额,可为各城市轨道交通企业提供参考。In order to meet the needs of construction and operation of urban rail transit facilities and equipment,many provinces and municipalities have successively issued budget quotas for urban rail transit projects.However,there are still deficiencies in the preparation of estimation and quota for urban rail transit operation facilities and equipment overhaul,such as the small number of announcements,large regional differences and low differentiation from new construction quota.In order to further improve the engineering pricing basis system and realize the cost reduction and efficiency of urban rail transit operating enterprises,it is particularly important to prepare the estimation quota for urban rail transit operation facilities and equipment overhaul.In the process of preparation of overhaul quota,it is especially critical to determine the main content and solve the key and difficult issues,and the scientific and practicality of quota preparation can be enhanced by collecting reliable supporting basis and carrying out actual calculation.Taking Shanghai municipal rail transit as an example,this article prepares the estimation quota of facilities and equipment overhaul,which could provide reference for various urban rail transit enterprises.
分 类 号:U239.5[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.248