基于高位巷与工作面进回风巷联合卸压的坚硬顶板防冲技术研究  

Study on combined pressure relief and scour prevention technology of high-level roadway and crossheading

作  者:谭云亮[1] 任文涛 李青海[1] 殷鹏涛 张修峰 王子郡 陈洋 胡善超[1] 李占海[1] TAN Yunliang;REN Wentao;LI Qinghai;YIN Pengtao;ZHANG Xiufeng;WANG Zijun;CHEN Yang;HU Shanchao;LI Zhanhai(College of Energy and Mining Engineering,Shandong University of Science and Technology,Qingdao 266590,China;Shandong Energy Group Luxi Mining Co.,Ltd.,Heze 274900,China;Shandong Energy Group Co.,Ltd.,Jinan 250101,China)

机构地区:[1]山东科技大学能源与矿业工程学院,山东青岛266590 [2]山东能源集团鲁西矿业有限公司,山东菏泽274900 [3]山东能源集团有限公司,山东济南250101

出  处:《煤炭科学技术》2025年第1期65-81,共17页Coal Science and Technology

基  金:国家自然科学基金资助项目(52374094);山东省泰山学者攀登计划资助项目(Tspd20210313);泰山产业领军人才工程资助(tscx202408130)。

摘  要:深埋特厚煤层开采后高位坚硬顶板失稳造成强矿压现象突显,严重威胁矿井安全生产。为探究新型卸压防冲方案,以新巨龙煤矿8302工作面为研究背景,提出了高位巷与工作面进回风巷联合爆破卸压防冲方案。通过理论分析、物理模拟和数值计算相结合的方法,分析了高位巷爆破与进回风巷爆破协同卸压原理,揭示了高位巷爆破卸压对于坚硬顶板的破断失稳机制,明确了高位巷爆破对于煤层应力场演化特征。针对现场工况条件,设计并实践了高位巷与进回风巷联合爆破卸压及监测方案,取得了显著的卸压效果。结果表明:①高位巷与进回风巷联合卸压,弱化了覆岩结构,使其产生大量裂隙,破坏了其连续性,降低了覆岩承载能力。②高位巷爆破使高位关键岩层初次垮落步距由144 m减小为84 m,周期垮落步距由24~30 m减小为12~24 m。煤层垂直应力由18.1~18.3 MPa减小至16.2~18.0 MPa,最大降幅11.47%,改善了工作面应力分布状况。③设计了8302工作面进回风巷与高位巷联合爆破卸压方案。并从进回风巷表面变形、覆岩应力、顶板深部位移等方面制定了监测方案。④现场工程实践表明:104 J及以上的微震能量事件降幅64.3%,微震事件由改性前的“低频高能”逐渐向改性后的“高频低能”转化。联合爆破卸压后,围岩变形、钻孔应力及锚杆索受力对断层及不规则采空区具有高度的敏感性,而在进入正常阶段后,围岩稳定性得到改善,联合爆破卸压效果显著。为解决大采高坚硬顶板引发的强矿压显现问题提供了理论依据及实践参考。The instability of high hard roof after deep-buried and extra-thick coal seam mining causes the phenomenon of strong ground pressure to stand out,which seriously threatens mine safety production.In order to explore a new scheme of pressure relief and scour prevention,taking 8302 working face of Xinjulong Coal Mine as the research background,a scheme of pressure relief and scour prevention by combined blasting of high roadway and gateway was put forward.By combining theoretical analysis,physical simulation and numerical calculation,this paper analyzes the principle of cooperative pressure relief of high roadway blasting and gateway blasting,reveals the frac-ture instability mechanism of high roadway blasting pressure relief on hard roof,and clarifies the evolution characteristics of high road-way blasting on coal seam stress field.According to the field working conditions,the pressure relief and monitoring scheme of combined blasting of high roadway and gateway is designed and practiced,and remarkable pressure relief effect is obtained.The conclusions are as follows:①The joint pressure relief of high roadway and gateway weakens the overlying strata structure,causing a large number of cracks,destroying its continuity and reducing the bearing capacity of overlying strata.②Blasting in high roadway reduces the initial caving step of high key strata from 144 m to 84 m,and the periodic caving step from 24−30 m to 12−24 m.The vertical stress of coal seam decreased from 18.1−18.3 MPa to 16.2−18.0 MPa,with the largest decrease of 11.47%,which improved the stress distribution of working face.③The pressure relief scheme of combined blasting along the gateway and high roadway in 8302 working face is designed.The monitor-ing scheme is made from the aspects of surface deformation,overlying rock stress and deep displacement of roof.④The field engineering practice shows that the microseismic energy events of 104 J and above decreased by 64.3%,and the microseismic events gradually changed from“low frequency and h

关 键 词:坚硬覆岩 联合爆破 冲击地压 卸压释能 微震监测 

分 类 号:TD324[矿业工程—矿井建设]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象