检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王秋杰[1,2] 刘国安 谭洪 翁汉琍[1,2] 李振兴[1,2] 谭坤侨[3] WANG Qiujie;LIU Guoan;TAN Hong;WENG Hanli;LI Zhenxing;TAN Kunqiao(School of Electrical Engineering and New Energy,China Three Gorges University,Yichang 443002,Hubei Province,China;Hubei Provincial Collaborative Innovation Center for New Energy Microgrid(China Three Gorges University),Yichang 443002,Hubei Province,China;Enshi City Company,State Grid Hubei Electric Power Co.,Ltd.,Enshi 445000,Hubei Province,China)
机构地区:[1]三峡大学电气与新能源学院,湖北省宜昌市443002 [2]新能源微电网湖北省协同创新中心(三峡大学),湖北省宜昌市443002 [3]国网湖北省电力有限公司恩施市公司,湖北省恩施市445000
出 处:《电网技术》2025年第3期889-898,I0011-I0013,共13页Power System Technology
基 金:国家自然科学基金项目(52307109);湖北省自然科学基金创新发展联合基金项目(2024AFD362)。
摘 要:不确定场景下鲁棒可行域能为虚拟电厂参与输电级调度提供定量出力估计。现有虚拟电厂鲁棒可行域研究未涉及电氢耦合系统,提出一种考虑电氢耦合的虚拟电厂鲁棒可行域模型与求解方法。首先,解析可逆固体氧化物电池双向电氢转换原理,构建电氢耦合虚拟电厂模型;其次,基于顶点投影凸包搜索法(projection convex hull search method,PC-SM),建立电氢耦合虚拟电厂鲁棒可行域模型;最后,针对电氢耦合虚拟电厂鲁棒可行域模型求解,利用列和约束生成算法(column-and-constraint generation,C&CG)求解PC-SM所提供凸包搜索方向下的顶点投影集,提出一种新的C&CG-PCSM耦合算法。算例仿真表明,所提模型与求解方法能够为电氢耦合虚拟电厂参与输电级调度提供定量出力估计理论支持。In uncertain scenarios,the robust feasible region can provide quantitative output estimation for virtual power plants to participate in transmission level scheduling.Existing research on the robust feasible region of virtual power plants has not addressed the electric hydrogen coupling system.A robust feasible region model and solution method for virtual power plants considering electric hydrogen coupling are proposed.Firstly,analyze the principle of bidirectional electro hydrogen conversion in reversible solid oxide cells and construct a virtual power plant model with electro hydrogen coupling;Secondly,based on the Projection Convex Hull Search Method(PC-SM),a robust feasible region model for a virtual power plant with electric hydrogen coupling is established;Finally,a new C&CG PCSM coupling algorithm is proposed for solving the robust feasible region model of a virtual power plant with electric hydrogen coupling,using the Column and Constraint Generation(C&CG)algorithm to solve the vertex projection set under the convex hull search direction provided by PC-SM.The simulation results show that the proposed model and solution method can provide theoretical support for the quantitative output estimation of virtual power plants with electric hydrogen coupling participating in transmission level scheduling.
关 键 词:虚拟电厂 鲁棒可行域 电氢耦合 可逆固体氧化物电池 分布式可再生能源
分 类 号:TM721[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:3.16.81.94