摘 要:在黄土地区深基坑开挖是建设工程的重点,为了研究黄土地区深基坑不同开挖阶段桩锚索支护结构内力及变形规律,以实际工程为基础对支护桩桩身钢筋应力、预应力锚索轴向拉力、桩身变形及桩顶位移进行了监测,结合监测数据对深基坑开挖过程中桩锚支护结构位移与内力的动态变化规律和特点进行了全面分析。结果表明:深基坑开挖过程中,空间效应对基坑开挖初期支护结构变形影响较小,对基坑开挖后期支护结构变形影响相对较为明显;预应力锚索的设置对支护桩桩身内力分布影响显著,最大值出现位置逐渐下移,一般在基坑底部内侧附近出现,且其对基坑支护结构内力和变形发展起到很好的控制作用。Excavation of deep foundation pits in loess area is a key focus of construction projects.In order to study the internal forces and deformation laws of pile anchor support structures in different excavation stages of deep foundation pits in loess areas,based on actual engineering,the stress of the steel bars in the supporting pile body,the axial tension of the pre-stressed anchor cable,the deformation of the pile body,and the displacement of the pile top were monitored.Combined with the monitoring data,a comprehensive analysis was conducted on the dynamic changes and characteristics of the displacement and internal forces of the pile anchor support structure during the excavation process of deep foundation pits.The research results indicate that during the excavation process of deep foundation pits,spatial effects have a relatively small impact on the deformation of the support structure in the initial stage of excavation,but have a relatively significant impact on the deformation of the support structure in the later stage of excavation;The setting of pre-stressed anchor cables has a significant impact on the internal force distribution of the supporting pile body.The maximum internal force value gradually moves downwards and generally appears near the bottom of the foundation pit.The pre-stressed anchor cables play a good role in controlling the internal forces and deformation development of foundation pit support structures.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49