摘  要:输电线路施工是电力工程中重要的施工环节,其施工质量直接关系到电力工程后续的运营效果,为此对跨越吊装一体机在输电线路施工中的应用进行研究。通过对现场跨越吊装一体机进行组装及利用跨越吊装一体机对输电线路跨越进行吊放,完成基于跨越吊装一体机的输电线路施工。通过实际工程案例的应用可知,展放的输电线路张力偏差均未超过±0.5 kN,符合相关规范要求,证明跨越吊装一体机在输电线路施工领域具有良好的应用前景。Transmission lines construction is an important construction link in power engineering,and its construction quality directly affects the subsequent operation effect of power engineering.Therefore,the application of cross lifting integrated machines in transmission line construction is studied.By assembling the on-site cross lifting integrated machine and using the cross lifting integrated machine to lift the transmission line,the construction of the transmission line based on the cross lifting integrated machine is completed.Through the application of practical engineering cases,it can be seen that the tension deviation of the deployed transmission lines does not exceed±0.5 kN,which meets the relevant regulatory requirements,proving that the cross lifting integrated machine has good application prospects in the field of transmission line construction.

关 键 词:跨越吊装一体机 输电线路施工 组装 张力 跨越吊放 施工质量 

分 类 号:TM752[电气工程—电力系统及自动化]

 