作 者:欧阳子帅 OUYANG Zishuai(Hubei Qingjiang Hydropower Development Co.,Ltd.,Yichang,Hubei 443000,China)
机构地区:[1]湖北清江水电开发有限责任公司,湖北宜昌443000
出 处:《自动化应用》2025年第5期262-264,270,共4页Automation Application
摘 要:在水布垭电厂机组扩修改造项目完成后,对4台主变压器进行维护检修。在检修过程中,识别出一系列新的问题,对这些问题进行全面的原因分析,并针对发现的具体问题提出定制化的解决方案。同时,对主变压器进行油中溶解气体分析和油简化分析试验,并对比大修前后的性能数据,以确保主变压器的可靠性。After the completion of the unit expansion and modification project at Shuibuya Power Plant,maintenance and overhaul work was carried out on four main transformers.During the overhaul process,a series of new issues were identified.A comprehensive cause analysis was conducted for these issues,and customized solutions were proposed for the specific problems found.At the same time,dissolved gas analysis and simplified oil analysis tests were performed on the main transformers.The performance data before and after the overhaul were compared to ensure the reliability of the main transformers.
分 类 号:TV738[水利工程—水利水电工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49