CR400BF标准动车组重联调试设备的设计及实现  

Design and implementation of reconnection debugging equipment for CR400BF standard EMU

在线阅读下载全文

作  者:班兆琪 吴化柱[1] BAN Zhaoqi;WU Huazhu(School of Automation and Electrical Engineering,Dalian Jiaotong University,Dalian 116028,China)

机构地区:[1]大连交通大学自动化与电气工程学院,辽宁大连116028

出  处:《电力机车与城轨车辆》2025年第2期57-61,共5页Electric Locomotives & Mass Transit Vehicles

基  金:大连市科技计划(2021JB12GX022)。

摘  要:传统的动车组重联调试设备在试验全面性、可靠性等方面存在一些问题,并且现场操作麻烦,需要耗费大量的人力物力。为了解决这些问题,文章提出一种新型的CR400BF标准动车组重联调试设备,并详细介绍了该设备的软硬件设计方案。该设备小巧轻便、自动化程度高,不仅能节省人力资源,还能够提高工作效率。The traditional EMU reconnection debugging equipment has some problems in the comprehensiveness and reliability of the test,and the on-site operation is troublesome,which requires a lot of manpower and material resources.In order to solve these problems,this paper proposes a new type of CR400BF standard EMU reconnection debugging equipment,and presents the hardware and software design schemes of the equipment in detail.The equipment is small,light and highly automated,which can not only save human resources,but also improve work efficiency.

关 键 词:动车组 重联调试设备 列车通信网络 

分 类 号:U266.2[机械工程—车辆工程]

 

参考文献:

正在载入数据...

 

二级参考文献:

正在载入数据...

 

耦合文献:

正在载入数据...

 

引证文献:

正在载入数据...

 

二级引证文献:

正在载入数据...

 

同被引文献:

正在载入数据...

 

相关期刊文献:

正在载入数据...

相关的主题
相关的作者对象
相关的机构对象