检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:胡杰 HU Jie(Yantian East Port International Container Terminals Limited,Shenzhen 518083,China)
机构地区:[1]盐田港东区国际集装箱码头有限公司,广东深圳518083
出 处:《水运工程》2025年第3期258-263,270,共7页Port & Waterway Engineering
摘 要:某港口工程为填海回填土地基,地层土质复杂且不均匀。针对复杂且软弱的回填土地基,为验证强夯处理加固效果与优化强夯施工参数,采用2500 kJ的夯击能,通过多区试夯、多遍点夯、设置最大夯击数、复夯及保险性碾压等技术措施对地基进行加固。经静荷载板试验等方法对夯前夯后场地地基进行分析评价,强夯法能使回填土地基达到加固设计要求。A port engineering involves land reclamation with backfill soil foundation,where soil layers are complex and uneven.In response to the complex and weak backfill foundation,in order to verify the reinforcement effect of dynamic compaction treatment and optimize the dynamic compaction construction parameters,we use a compaction energy of 2500 kJ,and apply technical measures to reinforce the foundation,such as multi-zone test compaction,multiple point compaction,setting the maximum number of compaction blows,repeated compaction,and ensuring rolling.Then we analyze and evaluate the foundation before and after compaction by test method such as static load plate test.The dynamic compaction method can make the backfill soil foundation meet design requirements for reinforcement.
分 类 号:U655.54[交通运输工程—港口、海岸及近海工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.49