检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:王远良 WANG Yuan-liang(Hunan Xuanda Construction Investment Co.Ltd.,Yueyang 414100,China)
机构地区:[1]湖南轩达建设投资有限公司,湖南岳阳414100
出 处:《工程建设与设计》2025年第5期21-24,共4页Construction & Design for Engineering
摘 要:以某超高层建筑深基坑施工过程中地下室加层为例,详细阐述了后续支护加固方案和施工顺序,并采用有限元软件分析了地下室加层结构对周边地铁结构及设施的位移和受力影响,通过分析和实测数据对比,得出了基坑施工不危及紧邻地铁站及其附属结构安全的结论。This article takes the construction process of adding floors to the basement of a super high-rise building deep foundation pit as an example,and elaborates on the subsequent support and reinforcement plan and construction sequence.Finite element software is used to analyze the displacement and stress effects of the basement adding floor structure on the surrounding subway structure and facilities.Through analysis and comparison with measured data,the conclusion is drawn that the construction of the foundation pit does not endanger the safety of the adjacent subway station and its ancillary structures.
分 类 号:TU753[建筑科学—建筑技术科学]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.3