检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:段艳菊 DUAN Yan-ju(Dalian Municipal Design&Research Institute Co.Ltd.,Dalian 116021,China)
机构地区:[1]大连市市政设计研究院有限责任公司,辽宁大连116021
出 处:《工程建设与设计》2025年第5期144-146,共3页Construction & Design for Engineering
摘 要:结合工程实例,分析了桥头引道石砌挡土墙病害产生原因,提出了对拉预应力锚杆加固方案,阐述了该技术设计时需要考虑的构造布置及计算要点,介绍了该技术加固施工步骤。项目的成功实施证明了在处理石砌挡土墙外倾问题时该方法是一种合理有效的加固方法。Based on the engineering examples,the causes of the retaining wall of the bridge approach stone are analyzed,and the reinforcement scheme of the prestressed anchor rod is put forward.This paper expounds the structural layout and calculation points of the technical design,and introduces the successful implementation of the project proves that the method is a reasonable and effective reinforcement method when dealing with the dumping problem of stone retaining wall.
分 类 号:U455.72[建筑科学—桥梁与隧道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.117