作 者:褚洪涛 CHU Hongtao(Shandong Yellow River Engineering Group Co.,Ltd.)
机构地区:[1]山东黄河工程集团有限公司
出 处:《广东建材》2025年第3期122-126,共5页Guangdong Building Materials
摘 要:依托某船舶产业园区道路路基处理实例,针对场地上部3.5~4.3m的新近填土,从技术特点、工程造价及施工周期等方面进行不同地基处理方案的比选,最终采用低能量强夯联合水泥土搅拌桩复合地基方案。最终检测结果表明:低能量强夯联合水泥土搅拌桩复合地基加固效果较好,可大幅度提高地基承载力,加固桩间土层,消除大部分工后沉降,满足设计要求。Based on an example of road subgrade treatment in a certain shipbuilding industry park,for the newly filled soil of 3.5-4.3m above the site,comparison and selection of different foundation treatment schemes were conducted from the aspects of technical characteristics,engineering cost,and construction period,and the final solution is to use low energy dynamic compaction combined with cement-soil mixing pile composite foundation.The final test results indicate that low energy dynamic compaction combined with cement-soil mixing pile composite foundation has good reinforcement effect.It can significantly improve the bearing capacity of the foundation,reinforce the soil layer between piles,eliminate most post construction settlement,and meet design requirements.
分 类 号:U416.1[交通运输工程—道路与铁道工程]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.171