检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:李天际 LI Tianji(Shanghai Construction No.5(Group)Co.,Ltd.,Shanghai 200333,China)
出 处:《建筑施工》2025年第3期378-384,共7页Building Construction
基 金:上海建工集团股份有限公司重点科研项目课题(20JCSF-23)。
摘 要:伴随城市化进程和国家产业转型升级的推进,大批污染型企业的搬迁导致城市中出现大量遗留污染场地,而此类场地根据用途的不同会进行分类处理。其中不乏存在由于后续土地用途变更导致前期场地修复程度不达标的情况。在城市建设的过程中,如何妥善解决此类情况成为了各大建筑企业及建设单位面临的重要挑战。依托上海市长宁某地块项目,阐述在其建设过程中遇污染水和污染土的情况,通过采用异位修复的技术路线来推进项目的顺利实施,可为后续类似工程提供借鉴。With the advancement of urbanization and the promotion of national industrial transformation and upgrading,a large number of polluting enterprises are relocated,leaving behind numerous contaminated sites in cities.These sites are classified and treated based on their intended use.In many cases,however,the initial site restoration fails to meet standards due to subsequent changes in land use.In the process of urban construction,properly addressing such situations becomes a significant challenge faced by major construction enterprises and development units.Using a project in Changning,Shanghai,as an example,instances of contaminated water and soil encountered during construction are addressed.By adopting the technical approach of ex-situ remediation,the project is smoothly implemented and provides a reference for similar future projects.
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:216.73.216.249