检索规则说明:AND代表“并且”;OR代表“或者”;NOT代表“不包含”;(注意必须大写,运算符两边需空一格)
检 索 范 例 :范例一: (K=图书馆学 OR K=情报学) AND A=范并思 范例二:J=计算机应用与软件 AND (U=C++ OR U=Basic) NOT M=Visual
作 者:卢东斌[1] 黄志岭[1] 龚飞 李海英[1] 卢宇[1] 凌建 LU Dongbin;HUANG Zhiling;GONG Fei;LI Haiying;LU Yu;LING Jian(NR Electric Co.,Ltd.,Nanjing 211102,China;State Grid Jiangsu Electric Power Co.,Ltd.,Nanjing 210024,China)
机构地区:[1]南京南瑞继保电气有限公司,南京211102 [2]国网江苏省电力有限公司,南京210024
出 处:《高电压技术》2025年第2期828-839,I0023-I0026,共16页High Voltage Engineering
基 金:国家自然科学基金青年基金(51607042)。
摘 要:高压直流输电系统在发生直流线路故障时,采用移相重启策略,通过控制整流器移相,快速抑制故障电流,经去游离时间后,解除移相,重启高压直流输电系统。但是,移相重启时,整流器和逆变器都不再消耗无功功率,换流站的交流滤波器将向交流系统提供盈余的无功功率,易导致交流系统过电压;对于对称单极拓扑结构,还将导致非故障线路不能传输有功功率,从而对交流系统产生很大的有功功率冲击。该文提出了直流线路故障穿越重启策略,在直流线路故障时,通过控制故障两端的整流器和逆变器的直流电流相等,在控制故障点电流为零的同时,直流电流穿越故障,继续维持无功功率消耗,避免交流系统产生过电压;对于对称单极拓扑结构,还可以利用故障极续流,继续输送部分有功功率。When a DC line fault occurs in a high-voltage DC transmission system,a phase-shifting restart strategy is used to quickly suppress the fault current by controlling the rectifier’s phase shift,and after going through the deionization time,the phase shift is released and the high-voltage DC transmission system is restarted.However,when phase-shifting re-starts,both rectifiers and inverters no longer consume reactive power,and the AC filter of the converter station will provide surplus reactive power to the AC system,which is prone to producing overvoltage of the AC system;for the symmetrical single-pole topology,it will also affect the non-faulted line that cannot transmit active power,which will produce a large active power impact on the AC system.This paper proposes a DC line fault ride-through restart strategy.In the event of a DC line fault,by controlling the rectifier and the inverter at both ends of the fault with equal dc currents,the DC current will ride through the fault while controlling the current at the point of fault to be zero,and the reactive power consumption will continue to be maintained to avoid the generation of an overvoltage in the AC system..For the symmetrical single-pole topology,the fault-pole continuation of the current can also be utilized to continue to deliver part of the active power.
关 键 词:高压直流输电 直流线路故障 移相重启 电流控制 穿越重启 交流过电压 去游离时间 直流电弧
分 类 号:TM7[电气工程—电力系统及自动化]
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在载入数据...
正在链接到云南高校图书馆文献保障联盟下载...
云南高校图书馆联盟文献共享服务平台 版权所有©
您的IP:18.220.204.192